Developments, refurbishments, hotels, retail and offices

Commercial and Subcontract Tiling in Croydon

Commercial tiling has different priorities from a home bathroom: a specification to meet, a floor that has to perform under heavy use, a programme set by someone else, and often a building that has to stay open while the work happens.

10/10 on Checkatrade · Checkatrade vetted

10/10
Checkatrade rating
£2m
Public liability cover
12 mth
Workmanship guarantee
Same day
Reply to enquiries

KS Elite Tiling takes on commercial and subcontract tiling packages across Croydon and South London. That covers residential developments and apartment blocks, property refurbishments, hotels and restaurants, shops and retail premises, offices, and work for landlords and developers on their own portfolios.

The work itself runs from wall and floor tiling through bathrooms, wet rooms and large-format porcelain, to communal areas, floor preparation, waterproofing and tanking, and remedial tiling on work that has failed or was never finished properly. Packages can be priced against your specification, or worked out from a site visit if there is not one yet.

The premises and clients we work with

Residential developments and apartment blocks are a natural fit: repeated bathroom and kitchen layouts, communal entrances, corridors and stairwells, and a programme that rewards a tiler who turns up when the schedule says. Landlords and developers with refurbishment work across a portfolio are the same picture spread over more addresses.

On the trading side, hotels, restaurants, shops, retail units and offices all bring their own constraints. A restaurant kitchen floor has to hold up to grease and washdown. A shop floor has to take footfall without showing wear in the first six months. An office refurbishment usually has to happen around people who are still working there.

What a commercial package can include

Wall and floor tiling is the core, and around it sit the parts that decide whether the finish lasts: floor preparation and levelling, waterproofing and tanking to wet areas, large-format porcelain where the specification calls for it, and full bathroom or wet room installations.

Communal areas are their own job. Entrances, corridors, stairs and shared washrooms take more traffic than anything inside a flat, and the tile, the slip rating and the setting-out all have to be chosen for that rather than borrowed from the apartment specification.

Remedial work is the other regular request. Tiling that has cracked, drummed, lifted or leaked usually failed at the preparation or the waterproofing rather than the tiling, so the first job is establishing what actually went wrong before quoting to put it right.

Working around a building that is still in use

Closing a shop, restaurant or office for the length of a full retile is rarely realistic. Work is more often phased: one area tiled while the rest stays open, or the job scheduled for evenings, early mornings or a quieter trading period agreed with whoever runs the site.

That needs planning before the first tile is cut, not worked out on the day. Dust control, safe access for staff and customers, where materials can be stored, and how noisy or disruptive stages are sequenced all affect the programme, and should be agreed as part of the quote rather than improvised on site.

Slip resistance and durability on a commercial floor

A commercial floor takes more traffic, more spills and more wear than most domestic settings, so the tile and finish need to suit that use rather than simply look right. Slip resistance is the main practical difference: a wet or greasy area, an entrance that gets rained on, or a heavily walked route all call for a tile rated for that level of grip, not a domestic-grade finish chosen on appearance alone.

Durability works the same way. A tile format, finish and joint width that would hold up fine in a home can wear, chip or discolour faster under sustained commercial footfall or wheeled traffic, so the specification needs to reflect how the floor will actually be used, not just how it will look on day one.

Working as a subcontractor to a main contractor

Some commercial jobs come with a full specification: a named tile, a slip rating, setting-out drawings and a defined scope from an architect, designer or the client's own standards. Where that exists, the quote is built against it directly, and any point that is not fully clear on the drawings is queried before work starts rather than assumed.

Where the tiling sits inside a wider fit-out, the main contractor's programme dictates when it can start and how long it has before the next trade needs the space. That sequencing, along with who protects the finished work afterwards, needs to be agreed up front so the tiling stage does not become the reason the whole programme slips.

KS Elite Tiling carries £2 million of public liability insurance and £10 million of employers' liability insurance with Allianz, and can send the certificate over with the quote where a main contractor or managing agent needs it on file before work starts.

What to expect

A clear route from enquiry to finish

  1. 01

    Review

    Look at the specification, drawings or schedule, or assess the site directly if none exists yet.

  2. 02

    Price the package

    Quote the scope against the specification, including preparation, tanking and any remedial work the site actually needs.

  3. 03

    Plan the programme

    Agree phasing, access, out-of-hours working and how the building stays in use during the job.

  4. 04

    Prepare

    Check the substrate and complete the agreed preparation for the tile and traffic level specified.

  5. 05

    Tile and hand over

    Install to the agreed specification and hand the area back ready for the next trade or for trading.

What shapes the quote

Commercial Tiling cost in Croydon

A reliable quote needs the room, tile and preparation scope. These are the main factors to share.

  • Area to be tiled and number of repeated units
  • Programme and any out-of-hours requirement
  • Slip rating and specification
  • Substrate condition and preparation needed
  • Waterproofing or tanking to wet areas
  • Access, floor level and material storage
What the quote covers

Four things agreed job by job

These are not assumed either way. They get priced and agreed with you before the work starts, so nothing turns into a surprise on the invoice.

  • Removing old tiles
  • Waste disposal and any skip
  • Substrate preparation, levelling and boarding
  • Clearing the space before we arrive
Straight answers

Questions people ask before booking

Every project is different. These answers set expectations before the room and tiles are assessed.

What kind of commercial premises do you tile?

Residential developments and apartment blocks, property refurbishments, hotels and restaurants, shops and retail premises, offices, and refurbishment work for landlords and developers. If your site is a type not listed, ask, because the deciding factor is usually the specification and the programme rather than the building.

Do you work as a subcontractor for main contractors?

Yes. Subcontract tiling packages within a wider fit-out or refurbishment are part of the normal workload. Send the specification, drawings and programme and the quote comes back priced against them, with anything unclear on the drawings queried before work starts.

Are you insured for commercial sites?

Yes. KS Elite Tiling holds £2 million of public liability insurance and £10 million of employers' liability insurance with Allianz. The certificate can be sent with the quote if a main contractor or managing agent needs it on file before anyone goes on site.

Do you tile communal areas in apartment blocks?

Yes. Entrances, corridors, stairwells and shared washrooms are regular commercial work. They take far more traffic than anything inside a flat, so the tile, slip rating and setting-out are specified for that use rather than carried over from the apartment specification.

Can you put right tiling that another contractor got wrong?

Yes, remedial tiling is a regular request. Tiling that has cracked, drummed, lifted or leaked has usually failed in the preparation or the waterproofing underneath rather than in the tiling itself, so the first step is establishing what actually went wrong before quoting to correct it.

Can the work be done outside normal opening hours?

Often, yes, where it is planned into the programme. Work can be scheduled around your trading hours, including evenings or before opening, but that needs to be agreed and priced as part of the quote rather than assumed as a standard option.

What slip rating does a commercial floor need?

It depends on the area: an entrance, a wet zone and a general walkway can call for different ratings. The right specification should reflect how the space is actually used, not be chosen on appearance alone.

Can tiling be phased so part of the space stays open?

In many cases, yes. Splitting the work into sections lets part of the space keep operating while another area is tiled, though the sequencing and any disruption need to be agreed as part of the programme, not decided once work is underway.

Croydon and South London

Planning commercial tiling in Croydon?

Send a few photos, rough measurements and the tile you are looking at. Quotes are free, and most jobs can be priced from that without anyone coming out.

Call nowGet a quote